trainz.luvr.net logo

Help this site-Donate !
Why all this?    No PayPal?
   Home Articles Projects/Workshops Media Downloads Search the Databases Links  
 
Articles

Tutorials

Building a Double Slip Switch, by John King
 Read | Write  comments: 12 Posted Thu Feb 07 2002 11:37am
Page: 1  2  3  4  5  6  7  8 

Step 7 - Placing the levers

To place the levers in their appropriate positions, simply place your cursor over the center of a junction spline and click the (LMB). The junctions are automatically numbered and you can even change these to names of your choice.

Two levers have been added using the procedure above. Notice that the lever for junction 100 is inside the junction, whilst the lever for Junction 101 is outside. (Preferred) (Fig.12)


fig.12

To move the lever to the outside, just press (R) and click on the spline. Here junction 100 has been successfully moved to the correct position. (Fig.13)


fig.13
 

Email the Webmaster

Trainz Luvr Privacy Policy

Auran Logo            Trainz Logo            JET Logo

Auran®, AURAN Jeti®, Trainz® are registered trademarks of Auran Holdings Pty Ltd.
Auran®, AURAN Jet®, Trainz® logos are © Auran.
This site © Trainz Luvr 2001-2016.
Trainz Luvr has been Online since Dec 17 2001, 7:52pm EST