trainz.luvr.net logo

Help this site-Donate !
Why all this?    No PayPal?
   Home Articles Projects/Workshops Media Downloads Search the Databases Links  
 
Articles

Tutorials

Building a Double Slip Switch, by John King
 Read | Write  comments: 12 Posted Thu Feb 07 2002 11:37am
Page: 1  2  3  4  5  6  7  8 

Step 7 - Placing the levers

To place the levers in their appropriate positions, simply place your cursor over the center of a junction spline and click the (LMB). The junctions are automatically numbered and you can even change these to names of your choice.

Two levers have been added using the procedure above. Notice that the lever for junction 100 is inside the junction, whilst the lever for Junction 101 is outside. (Preferred) (Fig.12)


fig.12

To move the lever to the outside, just press (R) and click on the spline. Here junction 100 has been successfully moved to the correct position. (Fig.13)


fig.13
 


Trainz Luvr Privacy Policy

Auran® is a registered trademark of N3V Games Pty. Ltd.
This site © Trainz Luvr 2001-2024
Trainz Luvr has been Online since Dec 17 2001, 7:52pm EST