Clear Lake Logging Railway
|
 Layout |
|
| Status: |
Final Release |
| Last Update: |
Tue Apr 15 2003, 02:50am |
| Leader: |
slugsmasher - Richard Blake |
 United States |
| Team: |
me |
|
|
Logging layout loosely based on the Clear Lake Lumber co. around 1910 in the state of Washington near Sedro-Wooley and the Skagit river. Will mainly showcase the 3' gauge logging stuff that is available from Narrowgauge, Whitepass, Sirgibby, Prowler901, Mike10 and myself. It only takes up one baseboard and is very detailed. It takes a good 45 minutes just to move skeletons up from the lake to camp and back down with a load of logs. There are switchbacks, cribbing bridges and lots of steep grades.
9APR03
Nearing completion and will come with a SCENARIO. Checkout the new pix.
13APR03
Final Version 1.0 Released!
goto front.htm for more info
|
|